Procedure to Generate the OT on Normal Days, Sunday and Public Holiday.
Overview
Business Scenario:
1. Generate OT on Normal days
2. Generate OT on Sundays
3. Generate OT on Public Holidays.
4. Generate OT on Public Holidays which Falls on Sunday
Configuration Steps:
Time Management --> Time Evaluation --> Time Evaluation with /Without Clock Times / Time Wage Type selection and Overtime Compensation --> Define Generation Rules
View: V_T510S
Over Time on Normal Days
Over Time on Sundays
Over Time on Public Holidays on a Working Days
Over Time on Public Holidays falls on Sundays
PCR – T Code: PE02
Copied Standard PCR MODT from ZMDT
Schema Setting
T Code – PE01
Copied standard Schema TM00 from ZOTA
Time Evaluation
T Code – PT60
After running PT60 successfully, Generation of OT on Normal Days, Sundays, Public Holidays, Public Holidays falls on Sundays.
Log - Time Evaluation
- OT on Normal Days (i.e., on 03.10.2013 (Thursday))
2. OT on Sundays (i.e., on 06.10.2013 (Sunday))
3. OT on Public Holidays on a Working Day (i.e., on 14.10.2013 (Monday))
4. OT on Public Holidays falls on Sundays (i.e., 13.10.2013 (Sunday))
View in PA30
Master Data Entry for Clock-in and Clock-out through Infotype 2011 (Time Events)